Location
Burlington, Ontario, Canada.
Budget
$1.35 Million USD
Total Size
765 m²
Status
Completed in 2020
In March 2020, Joseph Brant Hospital needed to increase bed capacity in anticipation of a surge in COVID-19 patients.
To provide a fast, safe solution, the hospital partnered with Sprung to design and deliver a temporary Pandemic Response Unit on hospital grounds.
The fully insulated 15.2 m × 50.3 m (50’ × 165’) structure added 93 patient beds and was completed and operational within just two weeks, in collaboration with BLT Construction. A 10’ × 110’ (3.05 m × 33.5 m) connecting corridor linked the unit to the hospital’s South Tower, with an air-lock system maintaining a negative pressure environment to minimize the spread of infectious particles.
This unit relieved pressure on acute care spaces by caring for patients with mild to moderate COVID-19 symptoms, providing oxygen therapy, special medications, and ongoing monitoring. Later, it was repurposed as a vaccination site, demonstrating the structure’s flexibility and speed of deployment.
Specs:
15.2 m wide × 50.3 m long
Connecting corridor: 3.05 m × 33.5 m
Fully insulated | Delivered and constructed in 14 days


