Location

Saskatchewan, Canada

Budget

N/A

Total Size

3774 m²

Status

Completed in 2014

The City of Martensville, Saskatchewan, together with the local school district, required a multi-use athletic facility to serve both the community and high school, with speed of delivery and cost efficiency as top priorities.

Sprung delivered a fully insulated, clear-span structure measuring 42.7 m × 88.4 m (140’ × 290’) that houses three full-size basketball courts, an upper running track, fitness area, multi-purpose offices, a food concession, and a 500-seat theatre.

Specs:
42.7 m wide × 88.4 m long | Fully insulated, clear-span | 1 rolling service door, 2 personnel doors | R30 fiberglass blanket insulation | Dupont Tedlar architectural membrane

Lincoln Airport
Walnut Hills High School